top of page

Beyond the roof and the field: can water, rails and vehicles keep the power on?

Writer: Büşra Yılmaz
Büşra Yılmaz
2 days ago
15 min read

Journey to Resilience, Part 3: Solar on water, on vehicles and on infrastructure


Solstrides Projects · Büşra Yılmaz-Depondt

In the early hours of 9 September 2019, Typhoon Faxai made landfall near the city of Chiba, east of Tokyo, with winds of up to 207 km/h. Power lines and poles came down across the prefecture. Two days later about 430,000 households in Chiba still had no electricity, some had no running water either, and temperatures in parts of the prefecture had climbed above 35 °C. A week after the storm, close to 80,000 households were still waiting.


On the reservoir of the Yamakura Dam in Ichihara, the storm struck Japan's largest floating solar plant, 13.7 MW of modules on plastic floats that had been running for only eighteen months. The wind tore sections of the array loose and piled modules on top of each other, and in the early afternoon a passer-by reported smoke rising from the water. Firefighters could not start work until the electricity had been cut, since fire, water and live equipment were all in the same place. About two-thirds of the plant was destroyed.


Elsewhere in the prefecture, in community halls in Kisarazu and Kimitsu, people were charging their phones and running fans from the batteries of electric cars that Nissan had sent to the area. In one house the family kept its lights and air conditioning on during the blackout from the car parked outside, using a home charger that could send power back into the house.


I opened with Chiba because the same storm shows both sides of this article. The floating plant had turned a surface nobody else used into a power station and then failed under a load it was not built for, while the cars, bought to get people from one place to another, became small power stations for whoever needed them.


Surfaces we have already built


Parts 1 and 2 looked at roofs and fields. This part covers the places that are neither: reservoirs and ponds, the buses, trucks and cars we already drive, and the noise barriers, canals, railways and car parks that line our roads. None of them needs new land, and that is why they attract so much interest. The IEA PVPS Trends report now treats floating PV and infrastructure-integrated PV as dual-use segments in their own right, alongside agrivoltaics.


For this series, the owners of these surfaces matter more than the area. A reservoir belongs to a water company or a hydropower operator, a bus roof to a transport authority, a refrigerated trailer to a logistics firm that may be carrying medicines, and a large car park often sits next to a hospital, a town hall or a supermarket. These are organisations whose own services have to keep running in an emergency. Water is a good example. In the United States, drinking water and wastewater systems use about 2% of all energy, mostly to pump water, and when the pumps stop the taps soon follow, as residents in Chiba found out.


So for each of the three groups, I want to know two things. What does solar on this surface actually deliver, by the evidence we have so far, and could it help an essential service keep working on the day the grid fails?


Solar on water


Floating PV puts ordinary modules on pontoons or frames that float on a lake, reservoir, quarry pond or treatment basin, anchored to the bed or moored to the banks. According to IEA PVPS, about 9.2 GW was installed worldwide by the end of 2024, with 1.5 GW added that year. In 2023 Asia held almost 90% of it, and the largest markets outside Asia were the Netherlands and France. One of the Dutch sites is the 27.4 MWp Bomhofsplas park, which covers about 30% of a former sand-extraction lake near Zwolle.

Solar on water and on vehicles

Two benefits are claimed for almost every project, a cooler module and less evaporation. Both have been measured at small scale. In an Italian experiment, a panel floating just above the water in a test basin ran 2.7 °C cooler on average than an identical panel on land, and covering about 17% of the basin cut evaporation by around 30%. Whether that holds for a whole reservoir is less clear. A team from EDF and INSA Lyon in France pointed out in 2026 that the benefit, although widely assumed, had not yet been properly measured at industrial scale. Their own measurements at a working plant, from May to October 2025, found evaporation about 44% lower over the covered water than from free water, and about 35% lower over the open water next to it.


Water quality is the question Dutch water managers ask first. At Bomhofsplas, researchers logged water quality for about ten months under the park and in open water more than 100 metres away, and used an underwater drone to take profiles and inspect the floats. They found little difference in the main measures, although the water under the panels was cooler, steadier in temperature and lower in oxygen, and they flagged bird droppings washing off the panels as a possible extra source of nutrients. At the Oostvoornse lake, a one-year pilot compared three different floating designs and measured light, water temperature and dissolved oxygen continuously beneath each, though the authors stress that the pilot was small and the conditions specific. A four-year study of an offshore array in the Dutch North Sea, published in 2026, found no measurable change in currents or mixing, and again the researchers point out that effects depend strongly on scale.


The applications closest to resilience are the ones where the water's owner uses the power. At the Rosedale wastewater plant in Auckland, about 2,700 floating modules cover one hectare of a treatment pond, and together with biogas from the plant itself they meet a quarter of its energy needs, mostly for pumping and aeration. In Kelseyville, California, a floating array on a treatment pond was sized to run the plant during the day, with the grid taking over at night.


The other promising combination is floating PV on hydropower reservoirs. At Alqueva in southern Portugal, the utility EDP floated about 12,000 modules, 5 MW in all, on the reservoir of a pumped-storage hydropower plant, added a battery of 1 MW and about 2 MWh, and connected all three through the dam's existing grid connection. That matters for this series because hydropower plants are usually among the first to bring a grid back after a blackout. After the Iberian blackout in April 2025, several Spanish hydro plants with black-start capability began the restoration within the first hour, alongside power brought back in over the lines from France and Morocco.


Yamakura is the reminder that water is a harsh place to build. Two weeks after Faxai, another typhoon destroyed a 2.4 MW floating plant in Kyushu. Yamakura was rebuilt with smaller floating islands, which put less strain on the structure and its anchors. A floating plant has to survive wind, waves and changing water levels for twenty-five years or more, and its design loads have to reflect the storms of the next few decades, which in many places will be stronger than those of the last.


Solar on vehicles


Vehicle-integrated PV, or VIPV, puts solar cells into the roof, bonnet or body panels of a vehicle, and vehicle-applied PV adds modules on top. Engineers have been fascinated by the idea for decades, from solar racing cars to boats and planes, and IEA PVPS Task 17 has been studying it for several years. Its 2025 fact sheet gives a sense of the upper limit for passenger cars. A very efficient solar car can use as little as 9 kWh per 100 km, and the Lightyear 0 was designed to drive up to 4,500 km a year on its own solar cells.


The Lightyear 0 also shows how hard the business is. Production started in Finland at the end of 2022 at about one car a week, with a price of around €250,000, and in January 2023 the company stopped production and its operating company was declared bankrupt, after only a handful of cars had been built. Task 17's 2026 report on passenger vehicles explains part of the difficulty. The cells have to follow curved surfaces, survive vibration, look good enough for buyers and add as little weight as possible, and every extra kilogram costs some of the energy the cells produce.


Commercial vehicles are a different case, because they have large flat roofs and spend long hours outside. Sono Motors, which had planned a solar car of its own called the Sion, now sells a retrofit kit for city buses. It adds about 1.4 kWp, roughly 8 m² of modules. Sono estimates about 3.3 kWh a day as a yearly average in Munich's weather and says the kit saves up to 1,500 litres of diesel a year by taking load off the alternator. The kit has received general operating approval in Germany. On refrigerated trailers, Thermo King's panels keep the refrigeration unit's battery charged so that the diesel engine does not have to run for it, and a European fleet operator in the pilot reported savings of up to 1,000 litres of fuel per trailer per year, from a six-month comparison of four trailers with panels and four without. Both figures come from the suppliers. In a five-month trial in California's Central Valley, a delivery truck with 1,800 W of solar on its roof and a battery-driven refrigeration unit, charged from the grid overnight, kept dairy products cold through the summer heat without a diesel engine.


For resilience, I think the more important vehicle story is the battery underneath, whatever its roof carries. In Chiba the cars had no solar cells at all, yet they kept homes and halls running. Nissan says a 62 kWh Leaf, connected through a portable power unit, can supply an average Japanese home for about four days. The Chiba family with the car outside found the limits too. Their system could only supply two circuits of 15 amperes each, so they had to decide which rooms and appliances got power, the same decision Part 1 asked building owners to make in advance.


The Netherlands is now testing what happens when cars like these are shared. Since June 2025, Utrecht's car-sharing service has run Renault 5s that can charge and discharge through public bidirectional chargers built by We Drive Solar, starting with 50 cars and planned to grow to 500. The project is designed to absorb solar power at midday and give some back at the evening peak, and We Drive Solar estimates that 500 such cars could provide about 10% of the flexibility the region needs.


Solar on infrastructure


The third group is the most varied, and its results are the most mixed. Along the A50 motorway near Uden, Rijkswaterstaat and its partners built a noise barrier 400 metres long and five metres high from two-sided glass solar modules, finished in February 2019 with EU LIFE funding. It does the job of any noise barrier, and its 136 two-sided panels, which generate on both faces, produce enough electricity for around 40 to 60 households. The Netherlands has about 1,250 km of noise barriers, so the idea could go a long way.


In Gujarat, the state started putting solar over its Narmada irrigation canals in 2012, with a 1 MW pilot on a 750-metre stretch near Chandrasan. The canal network already occupies public land, so no farmland has to be bought, and the panels shade the water. The project developers estimated that the pilot would prevent about 9 million litres of evaporation a year and that a later 10 MW plant would save 16 hectares of land. These are estimates from the operators. The structures are expensive, though. The 1 MW canal-top plant cost about $2.8 million, against $2.3 million for the same capacity on land, and maintenance over flowing water is harder, and a 2023 Mongabay report found that the cost of the mounting structures was the main reason the idea had spread so slowly.


On a regional line in Buttes, in the Swiss canton of Neuchâtel, the start-up Sun-Ways laid 48 modules of 380 W between the rails of a working railway in April 2025, about 18 kWp along 100 metres of track. The panels can be lifted out by machine when the track needs maintenance. In June 2026, after more than 11,000 trains had passed over it, Sun-Ways reported that the plant had produced over 16,000 kWh since May 2025, and France's national railway SNCF has signed an agreement to study how the panels affect track maintenance.


The cautionary tale is the road surface itself. In December 2016 France opened a one-kilometre solar road at Tourouvre-au-Perche in Normandy, 2,800 m² of panels paid for with about €5 million of state money. The panels lay flat, collected leaves and dirt, splintered under lorries and annoyed residents with noise. Within three years 100 metres had been removed as beyond repair, and local officials called it a failure in both energy and financial terms. Wattway, the Colas subsidiary behind it, said this was not the model it would take to market.


Car parks sit somewhere in between. France's 2023 renewables acceleration law, the APER law, requires outdoor car parks larger than 1,500 m² to cover at least half their area with canopies that produce renewable energy, with deadlines of July 2026 for the largest and July 2028 for the rest. The rules have since been loosened. A car park already half shaded by suitable trees is exempt, owners can combine canopies over part of the area with tree shade, and those who sign a commitment in time can defer, to January 2028 for the largest car parks and January 2030 for the rest. An energy services company quoted on French television put the potential of the country's car parks at 15 to 20 GW, while estimating that only 10 to 15% of them had solar so far.

Solar on infrastructure

Where it doesn't fit


The failures in this article have a pattern. Wattway put fragile modules flat where lorries drive over them and leaves pile up, Yamakura met a storm stronger than its anchoring could take, and Lightyear tried to fit enough cells onto a passenger car to change how it is used. In each case the solar part had to do something the surface was not suited to, while the noise barrier, the treatment pond and the bus roof ask the modules to do little beyond what they already do on any rooftop.


Cost is the other limit, as it was for BIPV and agrivoltaics. Floats, moorings, canal-top frames, two-sided glass barriers and removable rail panels all cost more than a ground-mounted plant, so they make sense where the surface brings something else, such as land nobody has to buy, water that does not evaporate, noise that has to be stopped anyway or a car park that already needs shade. Where none of that applies, an ordinary solar park is cheaper. The ecological questions are not settled either. The Dutch studies are reassuring for the sites measured, but every team behind them warns that a lake half covered with floats may behave differently from one with a small pilot.


From the reservoir to the clinic


What follows is my own inference. Almost everything described above is connected to the grid and built to sell or offset electricity, so on the day the grid fails most of it will switch off for the same reason the rooftops in Spain did. The floating array on a treatment pond, the noise barrier and the solar canopy over a car park all need what a building needs to keep going, an inverter that can run as an island, a battery and a short list of loads that come first.

what it would take to keep a service running in a blackout

With those in place, some of these surfaces sit in very useful spots. A water company that already floats solar on its own basins could, with storage and islanding, keep its most important pumps running through an outage of several hours, and that keeps taps and toilets working in clinics and homes downstream. A reservoir with black-start hydropower, floating PV and a battery, as at Alqueva, has the parts that could help restart a local grid sooner, though whether a system operator would want to use them that way is a question for the operators. A car park with solar canopies and bidirectional chargers next to a health centre or a school is a small energy hub, as long as someone has agreed in advance that the cars parked there can supply the building in an emergency and that the owners will be paid back.


Vehicles are the most flexible part, because they can move. In Chiba the cars drove to where the power was needed, and a bus fleet or a group of refrigerated trailers with solar on their roofs can keep some charge in their batteries for days without a plug. For vaccine transport or a mobile clinic that is worth more than the diesel the panels save in a normal year. I will look at batteries, islanding and microgrids properly in Part 4.


One question worth asking


If you run a water utility, a bus or delivery fleet, or a large car park next to a public building, ask one question before anyone talks about floats, canopies or retrofit kits. If the grid failed tonight, which of your surfaces or vehicles could keep one essential service running, and what stands between that solar power and the load, whether it is an inverter, a battery, a cable or a contract? Answer that first and let it shape the tender, because adding islanding and storage to a plant that was built only to export power usually means reopening the design.


Next time I will come back to what all three parts have pointed towards without covering in depth. Part 4 looks at batteries, controls and microgrids, and at what it takes to keep a clinic, a school or a street running when the network cannot.


The views expressed are those of Solstrides Projects and do not represent the positions of ETIP PV, IEA PVPS or any of its Tasks.


Sources

  1. The Japan Times, Typhoon Faxai: 430,000 Chiba homes without power, 11 September 2019. Outages, water, temperatures.

  2. The Jakarta Post / AFP, Almost 80,000 homes still without power a week after Japan typhoon, 16 September 2019. Outages after one week.

  3. pv magazine, Japan's largest floating PV plant catches fire after Typhoon Faxai impact, 9 September 2019. Yamakura plant, modules stacked by the wind.

  4. NPR, Typhoon Faxai rips through Tokyo area, 9 September 2019, with the TBS News report it quotes. Fire report and firefighting after the power was cut.

  5. pv magazine, The weekend read: Don't throw caution to the wind, 22 February 2020. Two-thirds of Yamakura destroyed, Shintaku Tameike plant in Kyushu.

  6. pv magazine, Japan's largest floating PV plant being reconstructed after typhoon impact, 22 February 2021. Wind speed of up to 207 km/h, rebuilding in smaller islands (Ciel & Terre).

  7. Nissan, How electric vehicles can help communities bounce back after a disaster, 20 September 2019. Leafs at community halls in Kisarazu and Kimitsu, four days of household supply.

  8. EVsmart, V2H protects lives from power outage following Typhoon Faxai, 2019. Family running their home from a car, two 15 A circuits.

  9. Energieforschung.de on IEA PVPS Trends in Photovoltaic Applications 2025. Dual-use segments.

  10. Power Magazine, Floating PV system provides smart energy and savings for wastewater plant, 1 May 2023. US water sector energy use (EPA figure).

  11. TaiyangNews, IEA PVPS: Global floating solar capacity reaches 9.16 GW in 2024. Global floating PV capacity, Asian share.

  12. WaterWorld, Floating solar, 25 February 2019. Kelseyville system on a treatment pond, daytime solar and grid at night.

  13. Majumder A. et al., Performance analysis of a floating photovoltaic system and estimation of the evaporation losses reduction, Energies 14, 2021 (open access). Module cooling and evaporation, measured in a test basin.

  14. Berlioux B. et al., Impact of floating photovoltaic power plant on reservoir evaporation, EGU General Assembly 2026, abstract. Evaporation at industrial scale.

  15. de Lima R.L.P. et al., In-situ water quality observations under a large-scale floating solar farm using sensors and underwater drones, Sustainability 13, 2021. Bomhofsplas water quality, measured.

  16. Bax V. et al., Floating photovoltaic pilot project at the Oostvoornse lake, Energy Reports, 2023. Three designs, water quality, measured.

  17. Wageningen University & Research, Multi-year field study provides insight into environmental effects of offshore solar energy, 13 March 2026. North Sea Two results.

  18. Greenpeace Aotearoa on the Rosedale floating array and pv magazine Australia, New Zealand's largest solar farm to be built on water, 3 September 2019. Rosedale size, share of plant energy, uses.

  19. EDP, Alqueva's floating solar panels, 20 March 2023, Enlit, Site visit: Europe's biggest solar-hydro hybrid plant, 2 April 2024 and Renewable Energy World on the Alqueva inauguration. Capacity, modules, battery, shared grid connection, pumped storage.

  20. ENTSO-E, Expert panel initiates the investigation into the causes of the Iberian blackout, 9 May 2025. Hydro black start and restoration.

  21. IEA PVPS Task 17, Fact sheet: Vehicle-integrated PV, status and perspectives, August 2025. Consumption and solar driving range.

  22. IEA PVPS Task 17, PV system technology considerations for PV-powered passenger vehicles, March 2026, and Challenges associated with the market entry of VIPV, September 2025. Curvature, weight, aesthetics, history.

  23. NL Times, Solar electric automaker Lightyear cancels production of its first expensive model, 24 January 2023, DutchNews, Lightyear 0 unit goes bust, 26 January 2023 and CarAdvice, Plug pulled on solar-powered electric-car company. Production rate, price, bankruptcy, handful built.

  24. Sustainable Bus, The retrofit Solar Bus Kit by Sono Motors, 27 July 2022, The Driven, Sono to roll out first solar bus kit in trial with Mercedes bus, 22 November 2022 and Munich Startup, Solar bus kit receives general operating approval, 15 January 2025. Capacity, area, estimated daily yield, claimed diesel savings, approval.

  25. Trane Technologies, Leveraging energy from the sun to reduce carbon emissions for ECS. Solar on refrigerated trailers, claimed fuel savings.

  26. HDT Trucking Info, Solar-powered reefer successfully tested in California, 11 October 2017. Rayfrigeration trial, overnight charging.

  27. Power to Drive, Europe's first vehicle-to-grid car sharing system, 4 November 2025 and electrive, V2G car sharing project to launch with Renault in Utrecht, 27 November 2024. Start date, fleet size, planned growth, flexibility estimate.

  28. Rijkswaterstaat, Solar Highways, Heijmans, What about Solar Highways and TNO/ECN on energy-generating noise barriers. A50 barrier, households supplied, Dutch noise barrier length.

  29. Scientific American / Thomson Reuters Foundation, India builds solar plants atop canals to save on land, water, 16 January 2015, Business Today, Solar panels over canals? The Gujarat experiment, 17 July 2026 and Mongabay India, Solar canals prove to be good for the environment but not for business, July 2023. Pilot, estimated water and land savings, costs, slow uptake.

  30. Swissinfo, Solar energy from railways shows first positive results in Switzerland, 23 June 2026 and Selectra, panneaux solaires entre les rails en Suisse, citing Sun-Ways' own figures. Pilot size, trains, output since May 2025, SNCF agreement.

  31. Global Construction Review, France's solar road dream may be over after test fails, 23 July 2019, Connexion, French solar road is a flop, 28 August 2019, Malay Mail / AFP, France to try again with solar road plan, 25 July 2019 and Motoring Research, The world's first solar road is a failure. Wattway at Tourouvre, damage, leaves and dirt, official verdict.

  32. Service-public.gouv.fr, Shading of existing parking spaces of more than 1,500 m², updated 14 August 2025, Tennaxia, An update on the 2026 APER law and Connexion, Solar car parks now mandatory, 11 August 2026. APER law obligations, deadlines, tree exemption and deferrals, industry estimate of potential.

 
 
 

Comments


bottom of page